Service Bulletin No. 545 A

Oil Filler Tube Inspection-Replacement Kit Installation Modification

Publications

Supersedes Service Bulletin No. 545

October 2, 2001

MODELS AFFECTED

I. All Textron Lycoming TIO-540-AJ1A and IO-540-AC1A5 aircraft engines shipped from the factory before October 30, 2000, unless Kit P/N 05K23081 has been installed.

II. All Textron Lycoming TIO-540-AJ1A and IO-540-AC1A5 aircraft engines that have had Kit P/N 05K23081 installed before May 1, 2001.

TIME OF COMPLIANCE

I. Inspect within the next 10 hours of operation and replace within the next 50 hours of operation.

II. Inspect at next oil change and modify installation, if required.

It has been determined that the existing oil filler tube installation could allow the clamp holding the tube to exert downward stress. This could result in damage to the filler tube.

 

 

Get It Exchanged

Use our Engine Exchange Program to order a new, rebuilt, or overhauled engine to experience more airtime and less downtime.